Assembly
Assembly Process
Step 1. Concrete Foundation(Plinth)

Step 2. Base Flame Complete.
Step 3. Bottom Panel (Drain Panel)

Step 4. Side Panel Block-1, Block-2

Step 5. Side Panel Block-3.

Step 6. Side Panel Block-4


Step 7. Roof Panel

Step 8. Internal Reinforcing
Step 9. Internal Ladder, External Ladder , Air Vent
Step 10. Anchor Setting.
Step 11. Final Checking and Cleaning Tank inside and outside.


Steel Foudation (Standard)
Tank Height | Main Steel Skid(A) | Sub Steel Skid(B) | |||
---|---|---|---|---|---|
Type | Size | Type | Size | ||
1.0M ~ 1.5M | ㄱ | Angle 75mm x 75mm x 6m(T) | ㄷ | C-Channel 75mm x 40mm x 5m | |
2.0M | Below 100m³ | ㄱ | Angle 75mm x 75mm x 6m(T) | ㄷ | C-Channel 75mm x 40mm x 5m |
Over 100m³ | ㄷ | C-Channel - 125 x 65 x 6.5 * 8mm(T) | ㄷ | C-Channel 75mm x 40mm x 5m | |
2.0M ~ 4.0M | ㄷ | C-Channel - 125 x 65 x 6.5 * 8mm(T) | ㄷ | C-Channel 75mm x 40mm x 5m | |
4.5M ~ 5.0M | ㄷ | C-Channel - 150 x 75 x 8 * 10mm(T) | ㄷ | C-Channel 100mm x 50mm x 5m |